Energy Administration, Ministry of Economic Affairs

Geothermal Power Generation Demonstration Incentive

地熱能發電示範獎勵

Subsidy ceilingUp to NT$100M (~NT$100,000,000)
Application deadline31 December 2030
Industry chapter07 · Net Zero Emissions

Eligibility

Joint-stock limited companies registered under Taiwanese law.

What’s offered

Shares the investment risk of building geothermal power plants by reimbursing a portion of surface-survey and well-drilling costs. The intent is to accelerate private-sector geothermal capacity additions.

Key terms

Subsidy ceiling
Up to NT$100,000,000 per case.
Cost-share rate
Not to exceed 50% of the applicant's combined actual spending on surface surveys and geothermal-well drilling.
Application deadline
Open through 17:00 on 31 December 2030 (ROC 119).

Program structure

Eligible cost categories

  • Surface survey costsGeology, geophysics, and geochemistry surveys and analyses.
  • Geothermal well drilling costsExploration wells, production wells, and re-injection wells — including drilling, casing, capacity testing, and wellhead installation.

Restrictions

  • Cannot duplicate items already funded by another government incentive or subsidy program.
  • Tail water from any installed geothermal power equipment must be re-injected back into the formation.

Application window

Rolling intake through 17:00 on 31 December 2030.

Who to contact

ITRI Geothermal Power Service Office

工研院地熱發電一服務窗口辦公室

Mr. Zhang (張先生)

(02) 2731-2119 #102

English-language application support: not confirmed. Plan to bring a Mandarin-fluent collaborator to the first conversation.

Source: 115年度產業輔導資源手冊 (FY2026 Industry Counseling Resource Handbook), Ministry of Economic Affairs, page 86. Translated and indexed by Compass Global. Verify terms with the issuing agency before applying.